Question 1

32


Refer to the exhibit. An engineer fails to implement a Cisco UCS Manager integration manager. The credentials and IP connectivity between Cisco APIC and UCS Manager are configured as expected. Which action resolves the issue?


Answer: D

Question 2

An engineer removes a VMM domain from an endpoint group called “EPG-1”, but the distributed port group
fails to be deleted. Which action resolves the issue?


Answer: C

Question 3

An engineer troubleshoots a fabric discovery failure. Which two requirements about switch connectivity must be
verified to solve the problem? (Choose two.)


Answer: A,B

Question 4

A network engineer is implementing the Cisco ACI Fabric and notices that the Leaf-1 switch is registered, has
an assigned name, but is displayed as inactive in the APIC. After further investigation, it became clear that the
leaf switch was recently moved from another Cisco ACI environment. Which action resolves the problem?


Answer: B

Question 5

300-615-page127-image46

Refer to the exhibit. RBAC is configured on the MDS switch for a new SAN administrator engineer to work on
the FSPF configuration. However, after the configuration is applied the engineer who was assigned the
FSPF_Admin role cannot perform any configuration changes. Which action resolves the issue?


Answer: A