Question 1

In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a
product. The cost of the assembly is calculated by using the standard costing method. The work definition and
resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing
estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up
costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.


Answer: A

Question 2

Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the Manufacturing Cloud?


Answer: B,D

Question 3

A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center
resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar
page.


Answer: D

Question 4

You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?


Answer: B

Question 5

Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.